Tuesday, September 30, 2014

Loft Flooring Strengthening Tji Tji Joists Details

Sfdbi.org
Voluntary strengthening & barrier free removal & voluntary revision to pa# 2007/12/03/9440 and pa# 2007/12/14/0492 non structural tenant remodel as built and field clarification details. #200801253279 3.00 1/25/2008 4/18 ti work including flooring partitions suspended ceiling ... Fetch Doc

Sfdbi.org
6 3/28/2008 9/25/2013 9 1/25/2014 5000 5000 2 0 2 0 0 2630 18 1167. 6 3/28/2008 9/25/2013 9 1/25/2014 5000 5000 2 0 2 1 0 2630 17 1167. 6 3/28/2008 9/25/2013 9 1/25/2014 800 800 1 0 ... Retrieve Content

No comments:

Post a Comment