BLDG.TOWARD REAR OF THE PROPERTY LINE @ 1ST LEVEL. BUILD ROOF DECK REMODEL (E) 1ST FLOOR FOR HABITABLE SPACE. (N) OFFICE (N) LIVING (N) BEDROOM FULL BATHROOM (N tilel flooring replace entrance doors w/accessible 3' door. #201001154828 8.00 1/15/2010 2/4/2010 ISSUED 9.00 8/4/2010 25000.00 ... Access Full Source
Www.in.gov
Note (3) Interior Components: Walls/ LF Flooring Ceiling Ptns&OF Lighting Heating Add A/C Sprk Unfinished occupancies (UF corrugated metal or composition There will be will have spaces to accommodate the manufactured home up close spacing and few facilities and are designed ... Document Viewer
Flooring: Vinyl composition tile is worn, missing and mismatched. Relocate if two remaining toilets and two lavs to accommodate new fixture spacing. Roof edges and curbs: roofing material top coat is starting to crack. ... Get Content Here
99SSP_Template
12 7.10 PREFINISHED METAL ROOFING 133. 12 7.11 SNOW GUARDS 136. 12 9.05 RESILIENT SHEET FLOORING 164. 12 9.06 PAINTING 165. 12 9.07 FIBERGLASS REINFORCED PLASTIC PANELS 169. Roof sections of exposed top box culverts. Prestressed members. ... Fetch This Document
Since stud spacing > 16” O.C. is worth 1 point in the Rating System, interior wall systems, flooring systems, roof trusses and internal trim packages constructed off-site at the Bensonwoord Homes facility in A project can earn ½ point for reuse of the finished roofing material ... Return Document
2 9/1/2005 3/21/2012 9 12/21/2015 1500000 3228000 13 2 44 3726 47 537 4159220200. 2 6/20/2007 3/20/2012 9 3/20/2014 500000 1050000 11 2 22 6529 12 3418. 6 10/2/2008 3/14/2012 ... Get Document
Www.in.gov
100 242.76 4.08 269.28000000000003 93.84 0 93.84 17.34 33.660000000000004 128.52000000000001 5.0999999999999996 162.18 31.62 17.34 116.28 24.48 61.2. 125 256.02 ... Return Document
Aicpwdea.com
Loft Insulation 200mm Loft Roll Insulation <ul><p class=`invtdesc1`><ul><li>Covers 5.93m2</li><li>Suitable for 600 and 400mm joist and rafter spacing</li><li>Glass mineral wool</li><li>Significantly improves energy efficiency</li><li>Compressed for easy handling</li><li>Easy to divide</li ... Read Full Source
Www.ibl.uni-stuttgart.de
Stone flooring Steinfußbodenbelag stone production machine Steinfertigungsmaschine natural stone roofing Bedachung aus Naturstein pool revetments Beckenverkleidungen actual stress top view of the roof Dachboden loft Dachdecker roofer tiler Dachdeckerarbeit roof tiling work Dachentwässerung ... Doc Retrieval
Since stud spacing > 16” O.C. is worth 1 point in the Rating System, Option #2 – having each stud, joist, and other framing details shown on the plans – is interior wall systems, flooring systems, roof trusses and internal trim packages constructed off-site at the Bensonwoord Homes ... Get Document
Www.dot.ca.gov
Insulation exposed by removal of existing roof covering shall be covered by new roofing or cutoffs the same day as removal. 13 Portions of insulation shall be removed to full depth at the locations where new wood nailers are to be placed. ... Retrieve Content
Replace Picture
Carpet, vinyl, and wood flooring in areas subject to high moisture. Chimney and fireplace. Cracks Door and windows. Floor structure had a number of non-standard beam and joist supports, Line 4 roll roofing. Roof—Roll roofing present. ... Read Here
REPUBLIC ACT NO. 6541
Steel joist floors shall have from one to four-hour fire-resistive rating based on internationally Corrugated wired glass may have supports 1.50 meters (5 feet) apart in the The roof covering of a bay or oriel window shall conform to the requirements of the roofing of the main roof. ... Retrieve Content
No comments:
Post a Comment